rus en     RUR/USD ($)   55.85 ↓   RUR/EURO(€)   60.79 facebook twitter
Background information via
+7 861 251 77 64

Construction of individual houses farmsteads

General information about the ground area
Planned use of ground areaConstruction of individual houses farmsteads
BranchHousing and municipal complex
Address of the areaKanevskoy area, station Kanevskaya, st. Slavic 2 V
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:11:0603350
Declared area (m2)2651.00
Limit size of the area (m2)2651.00
Land categoryLands of inhabited localities
Kind of allowed useHousing estate
Actual useIt isn't used
Permits, town-planning documentationThe decision of Council of Kanevsky area About settlement town-planning documentation Kanevsky area from 12/15/2005, report 11, item 16 The decision of Council of Kanevsky rural settlement About the statement of Rules of land tenure and building of Kanevsky rural settlement of Kayonevsky area from 30.12.2009 20 The decision of the head municipal union Kanevsky rural settlement About preparation a general layout municipal union Kanevsky rural settlement from 24.12.2008 2056
Information on a property
Short description of propertyisn't available
Cost of property, million rub.0.00
Information about proprietor (right holder)
ProprietorState ownership
Right holderKanevskaya area
Kind of rightRent
Information on the bankrupted enterprises
Market cost of the real estate (according to the report on an assessment in case of its carrying out). Total cost0.00
Cost of land plot property0.00
Initial price0.00
Information about encumbrance and limitation
Kind of encumbrance, limitationEncumbrances aren't established
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)JSC Kubanenergo
Power supply center (electrotension class)Middle class of tension from 1 kV to 35 kV
Power supply center (free power (MWt))0.01
Power supply center (distance(m))250.00
Nearest connection point (network tension, kV)10.00
Nearest connection point (distance(m))250.00
Gas-supplying
Gas pipeline (name, right-holder)JSC Kanevskaya raygaz
Gas pipeline (diameter(mm))76.00
Gas pipeline (pressure(MPa))Low-pressure pipelines to 0,005
Gas pipeline (carrying capacity(cube. m.in a year))0.00
Gas pipeline (distance(m))50.00
Nearest connection point (diameter(mm))76.00
Nearest connection point (pressure (MPa))Low-pressure pipelines to 0,005
Nearest connection point (carrying capacity (cubic meter a year))0.00
Nearest connection point (distance(m))50.00
Water-supply
Water supply source (name, right-holder)Art well, Kanevskoye with /
Water supply source (power (cubic meters a day))720.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))100.00
Nearest connection point (power (cubic meters a day))0.00
Nearest connection point (diameter(mm))150.00
Nearest connection point (distance(m))100.00
Sewage system
Type of building (name, right-holder)JSC Ochistnye sooruzheniya kanalizatsii
Type of building (power (cubic meters a day))0.00
Type of building (distance(m))0.00
Nearest point of connection (power (cubic meters a day))0.00
Nearest point of connection (diameter(mm))150.00
Nearest point of connection (distance(m))0.00
Installation of telephones/internet
Central network (distance(m))50.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub.0.32
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromThe nameDistance (km)
Center of municipal formation Art. Kanevskaya5.00
Nearest settlement Art. Kanevskaya0.00
Center of the subject of federation the city of Krasnodar120.00
Highways (regional, federal value) Krasnodar-Yeysk1.00
Highways of local value Kanevskaya - Pridorozhnaya0.05
Nearest railway station The item Kanevskaya3.00
Nearest railway The item Kanevskaya3.00
Airport Krasnodar airport130.00
Seaport seaport Yeysk110.00
Additional information about the ground area
Special conditionsClimate is moderate-continental. According to climatic division into districts it is zone SHB. The mid-annual amount of precipitation 500 mm, capacity of a snow cover 14 see According to cards of division into districts of climatic characteristics village territory concerns: - On weight of a snow cover to 1 area; - On average speed of a wind for the winter period 5m/with - On pressure of a wind to area SH; - On monthly average temperature of air in January -5C; - On monthly average temperature of air in July - +25; - On a deviation of average temperature of air of the coldest days from monthly average temperature in January-15C. In the geomorphological relation enters into area of akkumuljativno-erosive loessial plain grunty prosadochnye also concern the first and second category. Seismicity area 6 points.
Conditions of investor participationRent
Cost of rent/buy of the ground area, mln. rub.0.20
Geographical coordinates of object (dd.dddddd)
Latitude (N)46.04023100
Longitude (E)38.97784200
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of municipality of Kanevskaya area
Postal address353730 Krasnodar Krai, Kanevskoy area, Art. Kanevskaya, st. of Gorky, 60
Sitewww.kaninvest.ru
Phone/fax(86164) 7-54-07
E-mail addressinvest@kanevskadm.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipality of Kanevskaya area
Postal address353730 Krasnodar Krai, Kanevskoy area, Art. Kanevskaya, st. of Gorky, 60
Sitewww.kaninvest.ru
Phone/fax(86164) 7-54-07
E-mail addressinvest@kanevskadm.ru

Site map
facebook   twitter .
2015 © Administration of Kanevskaya district of Krasnodar region Disigned by: Internet-Image