Project name | Plant on production of an optical fiber |
Industry classification | Manufacturing industry |
Basic information about the project |
---|
Project essence | Organization of production of odnopodovy optical fiber and fiber-optical tape |
Project capacity | single-mode fiber with the displaced nonzero dispersion of G.655 - 345,6 thousand m a year; fiber-optical tape - 864 thousand m a year |
Consumer market description | Communications operators; organizations which are engaged in laying of telecommunication networks; the companies, providing the ekspluatatsiyugazodobyvayushchikh of stations, oil pipelines; advertizing and design agencies |
Object construction term | 1.00 |
Competitive advantage | Fiber-optical lines of communication in comparison with metal systems have certain advantages. The transmitted signal isn't distorted ichkhodyashchy of out of electromagnetic and radio-frequency hindrances therefore the optical cable is absolutely unreceptive to influence of a high voltage or a lightning. Production has high quality. |
Resource availability for project realization | For implementation of the project the land plot is allocated |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 3168.00 |
Planned volume of gas consumption (annual), million cubic meters | 0.00 |
Planned volume of water consumption (annual), million cubic meters | 0.00 |
Degree of project development | The business plan is developed, preliminary specifications are received |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 250.98 |
Own resources, million rubles | 0.00 |
Means of regional (municipal) budget, million rubles | 0.00 |
Previously involved means, million rubles | 250.98 |
Investment capacity, mln rubles | 0.00 |
Conditions of investor participation | Direct investments |
Form of investments return | Monetary |
Payback period | 4.50 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 9.51 |
Simple payback time | 6.00 |
Discounted payback period | 8.25 |
Internal rate of return (IRR) | 11.54 |
Productivity index (PI) | 1.05 |
Income per year | 98.12 |
Social efficiency of investment project |
---|
Number of workplaces | 34 |
Salary average level (thousand rub per year) | 308.55 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 12.32 |
which includes into consolidated budget of the krai, million rubles | 6.77 |
General information about the ground area |
---|
Address of the area | Krasnodar Krai, Kanevskoy area, Art. Kanevsky, western industrial zone |
Cadastre account of ground area | Not registered |
Cadastre number of area/of quarter | 23:11:0603320 |
Declared area (m2) | 36000.00 |
Limit size of the area (m2) | 36000.00 |
Land category | Industrial land use |
Kind of allowed use | Production |
Actual use | It isn't used |
Availability of buildings, structures, constructions | No, the site is free from building |
Permits, town-planning documentation | Local standards of town-planning design of the Kanevsky rural settlement of the Kanevsky region of Krasnodar Krai, approved by the decision of Council of the Kanevsky rural settlement of December 27, 2010 No. 81-on a design assignment "Rules земл |
Information about proprietor (right holder) |
---|
Proprietor | State ownership |
Right holder | Kanevsky area |
Kind of right | Another |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | Encumbrances aren't established |
Encumbrance area | 0.00 |
Electricity supply |
---|
Power supply center (name, right-holder) | OJSC "Kubanenergo" |
Power supply center (electrotension class) | The lowest class of tension – to 1 kV |
Power supply center (free power (MWt)) | 0.01 |
Power supply center (distance(m)) | 200.00 |
Nearest connection point (network tension, kV) | 0.40 |
Nearest connection point (distance(m)) | 200.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | JSC Kanevskaya raygaz |
Gas pipeline (diameter(mm)) | 79.00 |
Gas pipeline (pressure(MPa)) | Low-pressure pipelines – to 0,005 |
Gas pipeline (carrying capacity(cube. m.in a year)) | 0.00 |
Gas pipeline (distance(m)) | 250.00 |
Nearest connection point (diameter(mm)) | 79.00 |
Nearest connection point (pressure (MPa)) | Low-pressure pipelines – to 0,005 |
Nearest connection point (carrying capacity (cubic meter a year)) | 00.00 |
Nearest connection point (distance(m)) | 250.00 |
Water-supply |
---|
Water supply source (name, right-holder) | JSC Vodoprovod |
Water supply source (power (cubic meters a day)) | 600.00 |
Water supply source (quality of water) | Drinking water |
Water supply source (distance(m)) | 750.00 |
Nearest connection point (power (cubic meters a day)) | 0.00 |
Nearest connection point (diameter(mm)) | 89.00 |
Nearest connection point (distance(m)) | 350.00 |
Sewage system |
---|
Type of building (name, right-holder) | Local treatment facilities |
Type of building (power (cubic meters a day)) | 0.00 |
Type of building (distance(m)) | 0.00 |
Nearest point of connection (power (cubic meters a day)) | 0.00 |
Nearest point of connection (diameter(mm)) | 200.00 |
Nearest point of connection (distance(m)) | 0.00 |
Installation of telephones/internet |
---|
Central network (distance(m)) | 2500.00 |
Mobile communication (distance(m)) | 0.00 |
Rated price of the ground area supplying with engineering, mln.rub | 2.87 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | Art. Kanevskaya | 2.50 |
nearest settlement | Art. Kanevskaya | 0.00 |
Center of federal subject | Krasnodar city | 120.00 |
highways (regional, federal value) | Krasnodar-Yeisk | 5.00 |
highways of local value | Kanevskaya- Staroderevjankovsky | 0.50 |
nearest railway station | Art. Kanevskaya | 2.00 |
nearest railway | Art. Kanevskaya | 2.00 |
airport | Krasnodar airport | 130.00 |
seaport | seaport Yeysk | 120.00 |
Additional information about the ground area |
---|
Special conditions | Climate moderate and continental. According to climatic division into districts it is zone ShB. Average annual amount of precipitation – 500 mm, the power of a snow cover – 14 cm. According to zoning maps of climatic characteristics the territory of |
Cost of rent/buy of the ground area, mln. rub | 1.00 |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 46.089832 |
Longitude (E) | 38.953645 |
Notes | - |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | Name: Administration of municipality of Kanevskaya area Postal address: 353730 Art. Kanevskaya, st. of Gorky, 60 Site: www.kaninvest.ru Phone/fax: (86164) 7-03-07 E-mail address: gutko@kanevskadm.ru |
Postal address | 353730 Art. Kanevskaya, st. of Gorky, 60 |
Site | www.kaninvest. ru |
Phone/fax | (86164) 7-54-07 |
E-mail address | invest@kanevskadm.ru |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | The name: Administration of municipal union Kanevsky area The post address: the item Kanevsky street Bitter, 60 Site: www.Kaninvest.ru Phone/fax: 7-54-07; 7-52-07 The electronic address: post@kanevskadm.ru |
Postal address | 353730 Art. Kanevskaya, st. of Gorky, 60 |
Site | www.kaninvest. ru |
Phone/fax | (86164) 7-54-07 |
E-mail address | invest@kanevskadm.ru |
Executive (Full name, work position, phone number) | N. N. Burba - the deputy head of municipality Kanevskaya the area, (86164)7-08-07 |