Construction of the cargo (transport) terminal

Project nameConstruction of the cargo (transport) terminal
Industry classificationTransport
Basic information about the project
Project essenceThe investment project assumes construction of the cargo (transport) terminal in the village New Minsk. The area of warehouse infrastructure of the terminal makes 10 thousand sq.m. Within the project rendering services in terminal processing of freights is supposed that in medium-term prospect will allow to increase freght traffic of road trains on roads of regional
Project capacity72000 tons/year
Consumer market descriptionDrivers of the trucks following on the route Krasnodar-Yeysk
Object construction term1.00
Competitive advantageHigh quality and wide range of the provided services, favorable site of the terminal, high qualification of the personnel.
Resource availability for project realizationFor implementation of the project the land plot is allocated
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh1352.00
Planned volume of gas consumption (annual), million cubic meters0.02
Planned volume of water consumption (annual), million cubic meters0.01
Degree of project developmentThe business plan is developed, are got of the preliminary technical requirements
Financial estimation of the project
Total cost of the project, mln rubles234.00
Own resources, million rubles0.00
Means of regional (municipal) budget, million rubles0.00
Previously involved means, million rubles0.00
Investment capacity, mln rubles234.00
Conditions of investor participationDirect investments
Form of investments returnMonetary
Payback period5.00
Basic indicators of investment project economic efficiency
Net present value (NPV)12.03
Simple payback time4.50
Discounted payback period5.50
Internal rate of return (IRR)12.75
Productivity index (PI)1.06
Income per year 29.29
Social efficiency of investment project
Number of workplaces60
Salary average level (thousand rub per year)368.00
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles40.58
which includes into consolidated budget of the krai, million rubles25.02
General information about the ground area
Address of the areaKrasnodar Krai, Kanevskoy area, Art. New Minsk, highway "Krasnodar-Yeysk"
Cadastre account of ground areaNot registered
Cadastre number of area/of quarter23:11:0202001
Declared area (m2)50000.00
Limit size of the area (m2)50000.00
Land categoryReserved land use
Kind of allowed useTransport
Actual useNot use
Availability of buildings, structures, constructionsNo, the site is free from building
Permits, town-planning documentationLocal standards of town-planning design of the New Minsk rural settlement of Kanevsky district of Krasnodar Krai, utverkzhdenny the decision of Council of the New Minsk selksky settlement from 5/29/2013 No. 12.
Information about proprietor (right holder)
ProprietorState owership
Right holderKanevskoy area
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationEncumbrance is not set
Encumbrance area0.00
Electricity supply
Power supply center (name, right-holder)OJSC "Kubanenergo"
Power supply center (electrotension class)The lowest class of tension Ц to 1 kV
Power supply center (free power (MWt))0.01
Power supply center (distance(m))50.00
Nearest connection point (network tension, kV)0.04
Nearest connection point (distance(m))50.00
Gas-supplying
Gas pipeline (name, right-holder)JSC Kanevskaya raygaz
Gas pipeline (diameter(mm))76.00
Gas pipeline (pressure(MPa))Low-pressure pipelines Ц to 0,005
Gas pipeline (carrying capacity(cube. m.in a year))15737.00
Gas pipeline (distance(m))200.00
Nearest connection point (diameter(mm))76.00
Nearest connection point (pressure (MPa))Low-pressure pipelines Ц to 0,005
Nearest connection point (carrying capacity (cubic meter a year))15737.00
Nearest connection point (distance(m))200.00
Water-supply
Water supply source (name, right-holder)JSC ZHKU
Water supply source (power (cubic meters a day))250.00
Water supply source (quality of water)Drinking water
Water supply source (distance(m))350.00
Nearest connection point (power (cubic meters a day))250.00
Nearest connection point (diameter(mm))100.00
Nearest connection point (distance(m))350.00
Sewage system
Type of building (name, right-holder)Local treatment facilities
Type of building (power (cubic meters a day))0.00
Type of building (distance(m))0.00
Nearest point of connection (power (cubic meters a day))0.00
Nearest point of connection (diameter(mm))0.00
Nearest point of connection (distance(m))0.00
Installation of telephones/internet
Central network (distance(m))2730.00
Mobile communication (distance(m))0.00
Rated price of the ground area supplying with engineering, mln.rub0.70
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Art. Kanevskaya26.00
nearest settlement Art. Kanevskaya26.00
Center of federal subject Krasnodar city143.00
highways (regional, federal value) Krasnodar-Yeisk0.15
highways of local value Kanevskaya- Novominskaya0.02
nearest railway station Art. New Minsk5.00
nearest railway Art. New Minsk5.00
airport Krasnodar airport160.00
seaport seaport Yeysk80.00
Additional information about the ground area
Special conditionsClimate is moderate-continental. According to climatic division into districts it is zone SHB. The average annual amount of precipitation Ц 500 mm, the thickness of the snow cover is 14 cm. According to the map of the climatic characteristics the ter
Cost of rent/buy of the ground area, mln. rub0.33
Geographical coordinates of object (dd.dddddd)
Latitude (N)38.93067500
Longitude (E)46.30537000
Notes-
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameAdministration of municipality of Kanevskaya area
Postal address353730 Art. Kanevskaya, st. of Gorky, 60
Sitewww.kaninvest. ru
Phone/fax(86164) 7-54-07
E-mail addressinvest@kanevskadm.ru
Data about the applicant (executive authority/local government executive authority)
NameAdministration of municipality of Kanevskaya area
Postal address353730 Art. Kanevskaya, st. of Gorky, 60
Sitewww.kaninvest. ru
Phone/fax(86164) 7-54-07
E-mail addressinvest@kanevskadm.ru
Executive (Full name, work position, phone number)N. N. Burba - the deputy head of municipality Kanevskaya the area, (86164)7-08-07

Site map
¬верх
facebook   twitter яндекс.ћетрика
2015 © Administration of Kanevskaya district of Krasnodar region Disigned by: Internet-Image