Project name | Plant on production of biofuel |
Industry classification | Manufacturing industry |
Basic information about the project |
---|
Project essence | Plant main activity: production of biogas from a press (crude) since nearby there is a sugar plant as in production waste will be used when cleaning production of plant growing by agricultural enterprises. |
Project capacity | 332 million m3 of biogas a year |
Consumer market description | Target consumers - legal entities and individuals |
Object construction term | 2.00 |
Competitive advantage | Proceeding from that fact that in biofuel industry of Russia more than 85% of the made fuel go on the foreign markets a choice of strategy of plant has to provide high competitive advantages. Practical application of this strategy will allow biofuel plant of a message competent policy, both in the field of quality of let-out fuel, and in a price component. |
Resource availability for project realization | For production of biogas waste of branches of plant growing and animal husbandry, a beet press, household waste, milk plant waste — salty and sweet whey, etc. are used. |
Planned volume of resource consumption (annual) |
---|
Planned volume of electricity consumption (annual), MWh | 9281.00 |
Planned volume of gas consumption (annual), million cubic meters | 0.00 |
Planned volume of water consumption (annual), million cubic meters | 0.15 |
Degree of project development | The business plan is developed, are got of the preliminary technical requirements |
Financial estimation of the project |
---|
Total cost of the project, mln rubles | 2095.00 |
Own resources, million rubles | 0.00 |
Means of regional (municipal) budget, million rubles | 0.00 |
Previously involved means, million rubles | 0.00 |
Investment capacity, mln rubles | 2095.00 |
Conditions of investor participation | Direct investments |
Form of investments return | Monetary |
Payback period | 0.00 |
Basic indicators of investment project economic efficiency |
---|
Net present value (NPV) | 107.14 |
Simple payback time | 5.50 |
Discounted payback period | 7.75 |
Internal rate of return (IRR) | 16.57 |
Productivity index (PI) | 1.07 |
Income per year | 1298.30 |
Social efficiency of investment project |
---|
Number of workplaces | 80 |
Salary average level (thousand rub per year) | 37.87 |
Budgetary efficiency of investment project |
---|
Mid-annual tax payments, million rubles | 481.26 |
which includes into consolidated budget of the krai, million rubles | 139.84 |
General information about the ground area |
---|
Address of the area | Kanevskoy the area, North to the west of the Art. of Staroderevyankovskaya, along Novoderevyankovskaya Highway Staroderevyankovskaya-(at the left) |
Cadastre account of ground area | Not registered |
Cadastre number of area/of quarter | 23:11:0303000:300 |
Declared area (m2) | 80000.00 |
Limit size of the area (m2) | 80000.00 |
Land category | Industrial land use |
Kind of allowed use | Production |
Actual use | It is not used |
Availability of buildings, structures, constructions | No, the site is free from building |
Permits, town-planning documentation | The decision of Council of the Staroderevyankovsky rural settlement "About the approval of Rules of a zemlepolzokvaniye and building of the territory of the Staroderevyankkovsky rural settlement of the Kanevsky area" from 21.12.2009г No. 72 The reso |
Information about proprietor (right holder) |
---|
Proprietor | State owership |
Right holder | Kanevskoy area |
Kind of right | Another |
Information about encumbrance and limitation |
---|
Kind of encumbrance, limitation | Encumbrance is not set |
Encumbrance area | 0.00 |
Electricity supply |
---|
Power supply center (name, right-holder) | OJSC "Kubanenergo" |
Power supply center (electrotension class) | The lowest class of tension – to 1 kV |
Power supply center (free power (MWt)) | 0.01 |
Power supply center (distance(m)) | 50.00 |
Nearest connection point (network tension, kV) | 0.04 |
Nearest connection point (distance(m)) | 50.00 |
Gas-supplying |
---|
Gas pipeline (name, right-holder) | JSC Kanevskaya raygaz |
Gas pipeline (diameter(mm)) | 0.00 |
Gas pipeline (pressure(MPa)) | Another |
Gas pipeline (carrying capacity(cube. m.in a year)) | 0.00 |
Gas pipeline (distance(m)) | 0.00 |
Nearest connection point (diameter(mm)) | 0.00 |
Nearest connection point (pressure (MPa)) | Another |
Nearest connection point (carrying capacity (cubic meter a year)) | 0.00 |
Nearest connection point (distance(m)) | 0.00 |
Water-supply |
---|
Water supply source (name, right-holder) | JSC ZHKU |
Water supply source (power (cubic meters a day)) | 0.00 |
Water supply source (quality of water) | Drinking water |
Water supply source (distance(m)) | 50.00 |
Nearest connection point (power (cubic meters a day)) | 0.00 |
Nearest connection point (diameter(mm)) | 100.00 |
Nearest connection point (distance(m)) | 0.00 |
Sewage system |
---|
Type of building (name, right-holder) | Local treatment facilities |
Type of building (power (cubic meters a day)) | 0.00 |
Type of building (distance(m)) | 50.00 |
Nearest point of connection (power (cubic meters a day)) | 0.00 |
Nearest point of connection (diameter(mm)) | 100.00 |
Nearest point of connection (distance(m)) | 0.00 |
Installation of telephones/internet |
---|
Central network (distance(m)) | 150.00 |
Mobile communication (distance(m)) | 150.00 |
Rated price of the ground area supplying with engineering, mln.rub | 0.17 |
Distance to the large settlements and objects of a transport infrastructure |
---|
Remoteness from | Name | Distance (km) |
---|
center of municipal formation | Art. Kanevskaya | 5.00 |
nearest settlement | Art. Kanevskaya | 5.00 |
Center of federal subject | Krasnodar city | 125.00 |
highways (regional, federal value) | Krasnodar-Yeisk | 2.00 |
highways of local value | Staroderevyankovskaya-Novoderevyankovskaya | 0.10 |
nearest railway station | Art. Staroderevyankovskaya | 2.00 |
nearest railway | Art. Staroderevyankovskaya | 2.00 |
airport | Krasnodar airport | 140.00 |
seaport | seaport Yeysk | 115.00 |
Additional information about the ground area |
---|
Special conditions | Climate is moderate-continental. According to climatic division into districts it is zone SHB. The average annual amount of precipitation – 500 mm, the thickness of the snow cover is 14 cm. According to the map of the climatic characteristics the ter |
Cost of rent/buy of the ground area, mln. rub | 0.36 |
Geographical coordinates of object (dd.dddddd) |
---|
Latitude (N) | 39.33872600 |
Longitude (E) | 45.97915000 |
Notes | - |
Data on the project initiator (in case of existence information about the legal/physical person) |
---|
Name / Full name | Administration of municipality of Kanevskaya area |
Postal address | 353730 Art. Kanevskaya, st. of Gorky, 60 |
Site | www.kaninvest. ru |
Phone/fax | (86164) 7-54-07 |
E-mail address | invest@kanevskadm.ru |
Data about the applicant (executive authority/local government executive authority) |
---|
Name | Administration of municipality of Kanevskaya area |
Postal address | 353730 Art. Kanevskaya, st. of Gorky, 60 |
Site | www.kaninvest. ru |
Phone/fax | (86164) 7-54-07 |
E-mail address | invest@kanevskadm.ru |
Executive (Full name, work position, phone number) | N. N. Burba - the deputy head of municipality Kanevskaya the area, (86164)7-08-07 |